The Sustainable Use Directive (SUD) requires that all pesticide application equipment (PAE) is tested on a regular basis*
Any machine applying pesticides must be tested by the relevant dates. Timescales of test vary depending on type and size of equipment.
Machines applying micro-granular pesticides must be tested to the timescales specified below
1. SUD Requirements
a. First test due before the machine is 5 years old
b. Re-test every 6 years
Additional Requirements
2. Crops and Fresh Produce Assurance Scheme Requirements
a. Annual testing of granular nematicide applicators
b. All other equipment to SUD requirements
*The legal requirements are contained in the Plant Protection Products (Sustainable Use) Regulations 2012